26.02.2026

Grębów and Gorzyce – third information meeting as part of the STEŚ works for National Road No. 9

Tags:

The third information meeting with residents of the municipalities of Grębów and Gorzyce has taken place as part of the preparation of the Technical, Economic and Environmental Study (STEŚ) and the documentation for the application for the issuance of an Environmental Decision for the investment: National Road No. 9 (GP class) on the section from the Nowa Dęba bypass to the S74 Expressway.

The meeting was prepared and conducted by the designers from TPF Sp. z o.o., with the participation of representatives of the Contracting Authority – the General Directorate for National Roads and Motorways.

The discussions were lively and full of emotion, but above all very necessary. They provided a great deal of specific local information, particularly regarding daily commuting, local connections and the functioning of the existing road network.

The collected feedback will be analyzed in the subsequent stages of the work in order to develop solutions that are best suited to the actual needs.

Cooperating with:

EN