S19 expressway - Kraśnik – Janów Lubelski

TPF Sp. z o.o. implements for General Directorate for National Roads and Highways the design and works implantation supervision as well as the following Contract management: Design and construction of S19 expressway Lublin - Rzeszów, section of the end of Kraśnik bypass – Sokołów Młp. Północ interchange. Part 1: section Kraśnik (Słodków interchange currently Kraśnik Południe – not including the interchange) – Janów Lubelski (Kopce interchange currently Janów Lub. Północ – not including the interchange) in the beginning of about 18 km bypass.

The project includes the construction of expressway with two both direction lanes (with a reserve for the 3d lane) of 18,37 km length, the construction of two new interchanges (pipe type Szastarka interchange and Modliborzyce interchange of a half-clover type), traffic safety facilities, control and monitoring systems, local roads reconstruction, rest area of I category construction, the construction of environmental protection infrastructure (animal crossroads, culverts, acoustic screens, separation nets, devices for pre-treating rainwater).

 

Investor: General Directorate for National Roads and Highways
Location: Warsaw, Poland
Total contract value: PLN 7,4 mln gross
Implementation period: 04.2018 – today
Partners (Partner consortium): TPF Getinsa Euroestudios S.L.

Cooperating with:

EN