TPF Sp. z o.o. implements for General Directorate for National Roads and Highways supervision and construction works execution, as well as Contract management of the following task: Design and construction of the express road S61 Ostrów Mazowiecka – Szczuczyn, section: interchange Stawiski (without interchange) - the beginning of Szczuczyn bypass, on the length of about 18,002 km [S61].
S61 express road construction on the section starting from Stawiski interchange (not including interchange) till Szczuczyn bypass consists of:
- the construction of the S class road with a cross-section of 2x2 with concrete paving of 16,4 km total length;
- additional carriageway (left-side) at Stawisk bypass on the parameters of the express carriageway with concrete paving with a total length of 1,6 km;
- existing carriageway reconstruction (ultimately right-side) on Stwiski bypass with a cross-section of the express carriageway with concrete paving of 0,426 km total length;
- Grabowo interchange construction - WB type;
- public road 61 reconstruction - G class road section construction within the existing DK61;
- reconstruction of municipal(gminas) and powiats (counties) roads;
- MOP Zabiele Zachód and Zabiele Wschód, as a rest stop of I type;
- engineering facilities construction;
- construction of the traffic safety equipment and environment protection facilities.