TPF Sp. z o.o. implements for State Water Holding Polish Waters (Wody Polskie) the following service: Project Engineer Investor's Supervision over the following project implementation: Upgrading of the lock and control room at Krapkowice barrage, along with the outport reconstruction.
Within the scope of upgrading of the lock and control room at Krapkowice barrage, along with the outport reconstruction it is planned:
- To build a new chamber of the operational parameters of 190m length and 12m width, as well as technical, mechanical and hydraulic equipment;
- To reconstruct the existing watertight chamber along with the technical equipment;
- To upgrade infrastructure and accompanying objects necessary for the lock objects reconstruction, such as roads, bridges under the lower locks heads, to reconstruct and construct the outports and ports, to reconstruct Sonia siphon and wastewater, substitute plantings, to implement the warehouse yard, and embankments near the left platform of a new lock.
- New control room construction.